Home improvement floor heating pipe
- Categories:Case show
- Author:
- Origin:
- Time of issue:2019-06-11 17:09
- Views:
(Summary description)On July 16, 2018, during the maintenance of the micro-surface pavement in the Chaoyang-Jianping section of G101 National Road, a cold mix mixture was prepared with JBC-1758 styrene-butadiene latex modified emulsified asphalt, and the 20,000m2 micro-surface repair test section was completed. Achieve a good repair effect.
Home improvement floor heating pipe
(Summary description)On July 16, 2018, during the maintenance of the micro-surface pavement in the Chaoyang-Jianping section of G101 National Road, a cold mix mixture was prepared with JBC-1758 styrene-butadiene latex modified emulsified asphalt, and the 20,000m2 micro-surface repair test section was completed. Achieve a good repair effect.
- Categories:Case show
- Author:
- Origin:
- Time of issue:2019-06-11 17:09
- Views:
On July 16, 2018, during the maintenance of the micro-surface pavement in the Chaoyang-Jianping section of G101 National Road, a cold mix mixture was prepared with JBC-1758 styrene-butadiene latex modified emulsified asphalt, and the 20,000m2 micro-surface repair test section was completed. Achieve a good repair effect.
Scan the QR code to read on your phone